Starting with the right-hand wing panel
All ribs pinned in place over plans with a 1/2" X 3/8" piece of balsa stock used to set the proper wash-out.
Leading edge cap comes next and then sheeting is applied
Grain set-up to run parallel to the Leading and Trailing edges.
Top sheeting complete starting on the bottom. Landing gear installed and started sheeting the bottom.
Three sheets are edge glued, the grain aligned with the leading edge and then trimmed to meet the trailing edge sheeting.