March 7/8 2004

We have got a lot done over the past two weeks. All the 12v wiring is done, I just have to do the 110v AC. We purchased a mattres. The insulation is in the top. We have the windows, aluminum and galley hinge on order. The 5.1 surround sound (DVD, CD, MP3, AM/FM) is wired up and we should have the 7.1" flip down LCD installed by next weekend (after ordering it twice.)

[IMAGE]

Amy put the flooring down, it came out nice.

[IMAGE]

Once again my brother comes threw on the cabinets with some really nice doors

[IMAGE]

The counter top is in place with microwave

[IMAGE]

The old rim locks look like they will work but we are going with thumb locks like you see in most teardrops.