March 7/8 2004
We have got a lot done over the past two weeks. All the 12v wiring is done, I just have to do the 110v AC. We purchased a mattres. The insulation is in the top. We have the windows, aluminum and galley hinge on order. The 5.1 surround sound (DVD, CD, MP3, AM/FM) is wired up and we should have the 7.1" flip down LCD installed by next weekend (after ordering it twice.)
Amy put the flooring down, it came out nice.
Once again my brother comes threw on the cabinets with some really nice doors
The counter top is in place with microwave
The old rim locks look like they will work but we are going with thumb locks like you see in most teardrops.